Sanger West Educational Center Phase One
Sanger West Educational Center Phase One
Sanger Unified School District
This Educational Center project will include a Middle School and High School with a shared CTE complex between the two. The Educational Complex will be 463,776 SF at total build out. and will house over 2,500 students. Phase One consists of three buildings. The first is a two-story academic building that includes classrooms, labs, administration, and the library/Media Center. Two-story construction was selected to reduce the overall square footage necessary and improve site circulation. The second building is the multipurpose with stage and servery, as well as teachers lounge space. The third building is the maintenance and central plant which is intended to serve the entire Ed Center at total build out. The architectural moves are broad and extend the length of the main building in Phase one. This broad-brush style resulted in a unique and substantial feel to the look of the campus. There is a sleek simplicity to the design that is punctuated by blocks of school colors in blue and silver paint complemented by the use of metal paneling. This arrangement of the Academic and Multipurpose buildings helps to control access to the site, provide a safe interior plaza for students, and support effective supervision on campus.